An employee at the construction site, at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335764
An employee in the boiler-and-turbine room at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335763
Employees at the main control board at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335761
Construction of a new power block at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335759
Chinese specialists work on assembly of the turbine equipment at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335757
A Chinese specialist works on assembly of the turbine equipment at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335755
Chinese specialists during a lunch break at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335754
Chinese specialists work on assembly of the turbine equipment at the Troitskaya State Regional Electric Power Station in Chelyabinsk Region.10.12.2013#2335752