A worker goes up a ladder near dam outlet No. 1 at the Boguchany Hydroelectric Station.14.10.2012#1261044
Sunken logs seen near in floating booms near the Boguchany Hydroelectric Station dam.14.10.2012#1261042
Workers install the sign in the turbine hall of the Boguchany Hydroelectric Station.14.10.2012#1261041
The turbine hall of the Boguchany Hydroelectric Station and the first three assembled hydroelectric power-generating units.14.10.2012#1261040
A worker performs assembly works on the power-generating unit runner at the assembly site in the Boguchany Hydroelectric Station's turbine hall.14.10.2012#1261039
Workers perform assembly works in the Boguchany Hydroelectric Station's turbine shaft.14.10.2012#1261038
A worker seen standing on the cover of an assembled hydroelectric power-generating unit of the Boguchany Hydroelectric Station.13.10.2012#1261033
Vsevolod Demchenko, Boguchany Hydroelectric Station first deputy general director and chief engineer.13.10.2012#1261032
Workers perform assembly works on the hydroelectric power-generating unit's runner at the assembly site in the Boguchany Hydroelectric Station's turbine hall.14.10.2012#1261024
Workers perform assembly works at the hydroelectric power-generating unit of the Boguchany Hydroelectric Station.14.10.2012#1261022
A bus seen at the site near the turbine hall of the Boguchany Hydroelectric Station.14.10.2012#1261018
An engineer adjusts equipment in the turbine hall of the Boguchany Hydroelectric Station.13.10.2012#1261011
A lift crane seen in the flooded area in the Boguchany Hydroelectric Station water reservoir.13.10.2012#1261009