

The construction of water defenses at the mouth of the Neva River. Chief Project Engineer Sergei Kurayev. The Leningrad Branch of the Hydroproject Institute (Lenhydroproject).
- Categories: Labour, Science & Technology
- Location: St. Petersburg, Russia
- Event date: 01.03.1984
- Date published: 15.03.2011
- Author: V. Lozovskiy
- Credit: Sputnik
- Source: Sputnik
- Original: 84-15352, 35 mm film
- Media: JPEG, 3544x5160px, 3.3Mb