An oxidated copper power transmission cable that was replaced during the repairs at a 110 kV power transmission lines in Kaliningrad due to the reconstruction of the lines. During the works, executed by Yantarenergo, Kaliningrad was left without power supply for ten hours.
- Categories: Economy, Business & Finance
- Location: Kaliningrad, Russia
- Event date: 30.05.2010
- Date published: 30.05.2010
- Author: Igor Zarembo
- Credit: Sputnik
- Source: Sputnik
- Original: Digital
- Media: JPEG, 3429x2336px, 1.9Mb